Heavy Equipment Services

Unsafe Structure & Code Compliance Violations Rehabilitation

Front of home with violations before rehabilitationThis home was purchased with an existing unsafe structure cases open with Miami Dade county Building Department. The owners had to hire an attorney to file an injunction to put a halt to the demolition order that the county had placed on the property. In due time if the owners did not begin to correct the problems by submitting plans and permits, the department was in its right to demolish the existing house and leave the bill for the owner to pay. The county would then place a lien on the property in order for them to recuperate their monies.

After photo of fully rehabilitated residence
Rausa Builders, Corp. was hired to correct all the code compliance violations and the unsafe structure case. This was considered a full rehabilitation construction project. We demolished the rear illegal addition and rebuilt the rear envelope of the existing structure. In this demolition there were two illegal bathrooms and one bedroom utilized as an efficiency. We re-wired the complete residence with new electrical wires, electrical panel and meter box. We replaced the water supply lines as well as the cast iron sewer lines that were exposed after demolition. The bathrooms and kitchen were completely remodeled. A new Central Air Conditioning Sysytem was installed with all new duct work. All the windows and entry doors were installed new with hurricane storm panels. The homes old shingle roof was replaced with a new clay tile roof and a circular asphalt driveway was created. The complete residence was cement stucco as the existing exterior walls are from frame structure. The complete interior floor was enforced with new 1/4″ tile backer and was completely tiled throughout.

Miami Home Addition

This home addition required some demolition of the original structure in order to add more entertaining area, a bedroom and bath. It added an extra 800 sq. ft. of living area to the residence and required new block walls, a concrete foundation, a new roof and interior framework.

Industrial / Commercial Fryer Room Construction

Here we built a new fryer room using a state of the art fryer system, the only of its kind in Florida. The project includes all of the necessary fire suppression systems and alarms, complex electrical control panels, plumbing with grease trap, stainless steel exhaust, supply ducts and hoods.

Chiseled Edge Travertine Paver Pool Deck

Posted by Certified General Contractor & Roofing Contractor on March 26, 2012
Exterior, Heavy Equipment Services, Pavers, Pool Deck, Remodeling / No Comments

This pool deck was installed by Rausa Builders, Corp. using Chiseled Edge Travertine Pavers which matches the pavers we installed in the clients circular driveway and front porch.

 

Work Without Permit Fix

Posted by Certified General Contractor & Roofing Contractor on March 23, 2012
Code Compliance Violations, Heavy Equipment Services, New Roof / Roof Repair, REO, Structural Repair, Work Without Permit Fix / No Comments

This home was purchased in 2009 and the owner added multiple residential addition without permits. When the property was foreclosed on in 2010 inspections revealed the illegal construction resulting in a Work Without Permit Violation which Rausa Builders, Corp. was hired to demolish the non-permit part of the homeĀ  and bring the structure back to code.